Careful electrics for the bays.5% off for pensioners<07763 100 477 · hello@broadstairselectrical.co.uk
Broadstairs & ElectricalBays · Cliffs · St Peter's · CT10

Service · EV chargers

EV chargers sized to your actual supply, notified to UKPN, wired for a Broadstairs winter.

A 7kW charger takes 30A and does not care that the shower is also drawing 40A. On a St Peter's 60A cutout that matters, on a Kingsgate 100A supply it usually does not, and on any Broadstairs seafront address the salt corrosion changes the fixings and enclosure we specify. We check the supply, size the charger, file the DNO notification and install for a fixed price.

What is included

  • 7kW single-phase charger (or 22kW three-phase where the property has a three-phase supply, uncommon in Broadstairs) from an OZEV-approved model list, with the OZEV Electric Vehicle Chargepoint Grant paperwork prepared if you qualify
  • Dedicated 32A radial from the main consumer unit or a sub-board, in T&E sized for run length and thermal grouping
  • Type A or Type B RCD protection as required for the specific charger model, or the charger's own built-in DC leakage detection where the manufacturer specifies that route
  • Load management module wired to the incoming meter tails where the property is on a shared or 60A main, so the charger throttles automatically when the oven and shower are on together
  • UK Power Networks G98 notification filed as standard for a 7kW install, or G99 application submitted in advance where total dwelling load exceeds the G98 threshold
  • Full commissioning test, connection to the customer's home Wi-Fi or 4G module, and a walk-through of the charger's app on the day

OZEV grant, in short

The OZEV EV Chargepoint Grant is not the old plug-in grant. It applies to renters and flat owners with dedicated off-street parking, and to landlords installing on a rented property, and pays up to £350 towards a socketed chargepoint installed by an OZEV-authorised installer. Owner-occupier houses no longer qualify, but the grant remains the main route for the buy-to-let landlord market and for the flats above Broadstairs seafront where a dedicated bay was allocated by the developer.

Broadstairs specifics that change the design

  • Kingsgate and North Foreland larger properties. Detached homes on these roads often have 100A cutouts, sometimes three-phase. Headroom is comfortable, and a 7kW charger drops in without load management, though on a household running an ASHP or induction range we still fit it because winter peaks catch out even generous supplies.
  • St Peter's and Broadstairs town centre semis. Frequently on 60A or 80A cutouts. A 7kW charger takes 30A on its own; a shower can take 40A. Load management is the difference between a straightforward G98 and a rejected G99. We size it before we quote.
  • Victorian villa street parking. On roads where the parking bay is across the pavement, the charger cannot legally trail a cable over public footpath. Options are a bollard-mounted unit on the front boundary with a compliant cable channel, or a gully cover system agreed with Kent County Council highways. We flag this at quote, since some Victoria Parade addresses cannot be legally installed at all without a cross-pavement solution.
  • Seafront salt corrosion. Chargers within a few streets of the bays get an IP65-rated model as a minimum, marine-grade stainless fixings, and glands oriented so any driven rain runs off. Standard mild-steel bracket kits corrode inside two winters.

DNO notification: G98 versus G99

UK Power Networks is the distribution network operator for Kent. Under Engineering Recommendation G98, a single-phase generator or bi-directional device up to 16A per phase (which covers a standard 7kW charger with an appropriate manufacturer classification) can be notified after installation, within 28 days. Under G99, anything above that threshold, including a 22kW three-phase install, needs application and approval before commissioning, which can take four to eight weeks. On a household already running a 4kW+ solar array or a heat pump, cumulative export or load can push a nominally 7kW install into G99 territory. We check before we quote and file the correct paperwork with UKPN.

Victorian villa install: the cable route matters as much as the charger

The charger goes up in an hour. Getting a 6mm or 10mm dedicated feed from the consumer unit at the back of the hallway to a driveway-side bracket at the front, without cutting horizontal chases across original plaster, is what takes the day. Preferred routes are under first-floor boards, down a chimney-breast void, then out through the front-elevation cellar or void. We plan the route before the visit.

How the day runs

Power off at 09:00, board opened, new 32A RCBO landed. Cable pulled through the planned route, glanded at the charger position. Charger fixed to a suitable substrate (front-elevation brick, drive-side post, or garage wall) at the height agreed. Commissioning: earth-fault-loop tested at the charger, RCD or DC-leakage function verified, app pairing, live vehicle test if one is on site. Documentation: EIC, manufacturer commissioning cert, OZEV grant claim if applicable, G98 notification to UKPN.

Indicative pricing

  • £850 to £1,000 - 7kW charger, straightforward run under 5m from board to bracket, no load management
  • £1,000 to £1,200 - typical Victorian villa with a 10 to 15m run through voids and one small chase, load management module included
  • £1,200 to £1,400 - larger property, integrated with existing solar and battery, three-phase or G99 route

Excludes the charger itself if a specific model is customer-supplied outside our OZEV list. The OZEV grant, where applicable, is deducted at invoice.

Compliance in short

Work is completed to BS 7671:2018 Amendment 2:2022, including Section 722 for EV charging installations. Notified under Part P to Thanet DC building control. UK Power Networks G98 or G99 filed per install. OZEV grant paperwork handled where the customer qualifies.

Always on every job

BS 7671 test certificate Part P notified where required Fixed price after site visit No upfront deposit

Get a fixed price

Photos and postcode to hello@broadstairselectrical.co.uk or WhatsApp. Same-day quote in most cases, site visit before any work starts.